Monday, April 25, 2011

New Location (Stage 5 - Week 7)

Prior to the discussion with Mr Erwin and Mr Bud last week, we have come to a new decision to change the location of the sound installation, from the toilet to the FCM elevator near the lecturers room. This is due to certain consequences that may happen if we were to carry out the installation in the toilet. Because of that, we have decided that it would be better if we make the elevator as a new location for our sound installation.

Below are some photos we have taken of the new proposed location.








No comments:

Post a Comment